17. 4. 2023


Supply of the first of three steam drums, which will be installed in a Energy waste plant in Nice, France


back

Supply of the first of three steam drums, which will be installed in a Energy waste plant in Nice, France. The pipes and header shipped with the drum, which was cut off after the pressure test and shipped separately.
Dimensions: 7.4 x 1.9 x 2.2 (m)
Weight: 12 300 kg



© 2024 VÍTKOVICE ENERGETICKÉ STROJÍRENSTVÍ a.s. | firla.eu